List of completed or ongoing projects
Road, safety, transport and traffic

No.

Title of the Project and its Location

Date of Implementation

1

Studying KhoramAbad- Poldokhtar Road

7/2019

2

Studying the First and Second Stage of Coastal Road Bushehr-Shift-Genaveh (100 km)

6/2019

3

Studing Helivand-Shah Ahmand Road

1/2019

4

Studying the First and Second Stage of Neyzang-Tangeh Eram Road

9/2018

5

Studying the first and second stages of type C improvements of the Lia-Ardagh-Ak route with a length of 39 km

06/4/2019

6

Studying a section of bridges and intersections of the Bushehr second exit highway project

7/3/2017

7

Controlling the previous (including the first and second steps) or ongoing studies on construction and asphalt pavement of the main roads by the province level consultants (fourth factor)

20/12/2016

8

Studying the first and second stage of Bushehr highway second exit

14/10/2015

9

Improvement studies of type (D-A) of Dalki - Kenartakhte road route Dashtestan County

26/5/2015

10

Studying the access route to Sefidkooh Mines in Baraftab Lorestan, with an approximate length of 8 km

18/3/2015

11

Evaluation of pavement, identification of parts and selection of suitable protective asphalt for selected roads of Gilan province

26/2/2015

12

Studying the first and second stages of improvement of Malekshahi - Meyme route with a length of 40 km long

16/11/2014

13

Studying the first and second stages of connecting Aran & Bidgol bypass to the Qom-Garmsar route with a length of 105 km

12/10/2014

14

Studying the first and second stages of making the entrances to the city of Garmi 4-lane

8/7/2014

15

Studying the first and second stages of the construction of Pirhajat – Ashgabat route

3/7/2014

16

Studying the first and second stages of type 5 (e) improvement of the second lane of gachsaran-kheirabad route with a length of 40 km

24/4/2014

17

Studying the first and second stages of type 5 (e) improvement of the second lane of gachsaran-kheirabad highway with a length of 25 km

24/4/2014

18

Exploratory studies of the Pateq - Sarpol-e-Zahab route with a length 18 km and the construction of a 1600-meter twin tunnel

6/9/2013

19

Studying the first and second stages of type 4 (type D-B) improvement of the second lane of Bisotoun-Sanqor with a length of 30 km

28/1/2013

20

Studying the first and second stages of Qom-Salafchegan-Rahjerd highway with a length of 60 km

23/7/2012

21

Studying the second stage of Type 5 (e) improvement of the second lane of Behmai County entrance with a length of 8 km

19/1/2012

22

Studying the first and second stages of the road of gas wells and the detour road of Salman facilities in Lavan region with a length of 22 km

13/8/2011

23

Identification and zoning of avalanche points and preventing the movement and fall of the avalanche in Shamshak - Dizin route with a length of 13 km

9/3/2011

24

Exploratory studies on the construction of the second lane of Shooshtar-Gotvand route

15/8/2010

25

Studying the first and second stages of improvements (type d-b) for making mohammadieh - abeyek route 4-lane with a length of 35 km

17/6/2010

26

Studying the first and second stages of the construction of Noushabad - Ali Abad (Kashan) route with the length of 7 km

8/6/2010

27

Studying the first and second stages of type (D-B) improvement to make Abbas Abad - Foulad (Aran & Bidgol) route 4-lane with a length of 8 km

8/6/2010

28

Studying the first and second stages of the construction of the second lane of Marand bypass with a length of 8 km

1/7/2009

29

Studying the first and second stages of the Aran & Bidgol bypass with a length of 47 km

9/5/2009

30

Preliminary studies for the construction of second lane (type D-B improvement) of the old Amol - Babol route with a length of 30 km

25/12/2007

31

Studying the first and second stages of immunization of high accident zones in Shahid Kasai Highway in Tabriz with a length of 16 Km

9/9/2007

32

Studying the first and second stages of the Malekshahi - Meyme three-way with a length of 25 km long

10/7/2007

33

Studying the development of the access road of the salt lake

26/11/2016

Intersection, bridge and tunnel

No.

Title of the Project and its Location

Date of Implementation

1

Studying the first and second stages of the technical building of two river bridges and two intersections located at the Baqmalek – QalaTel route and Baqmalek bypass

18/1/2015

2

Studying the grade separation of Bashrooyeh three-way (Shaheed Zare)

1/3/2017

3

Studying the grade separation of Zanjan University with the old Mianeh route

24/8/2015

4

Performing the first and second phase studies of the bridge entrance of Yas town together with geotechnical studies

10/2/2015

5

Studying the first and second stages of the bridge and grade separation of Keshvari Square in Ilam

7/2014

6

Studying the first and second stages of two bridges and the grade separation of Gachsaran-Kheirabad highway

5/2014

7

Studying the first and second stages of Shams Arab River Bridge (70 meters) at Gachsaran-Kheirabad Highway

5/2014

8

Exploratory studies on the construction of a 1600-meter twin tunnel  at Pataq - Sarpol-e-Zahab route

6/9/2013

9

Studying the first and second stages of the grade separation of Chaharzebar in Islamabad highway of Kermanshah

10/8/2012

10

Studying the first and second stages of the grade separation of Kermanshah – Hamadan route and Sahneh highway

21/7/2012

11

Studying the first and second stages of the grade separation of Biarjmand three-way in Shahrood - Sabzevar route

7/4/2012

12

Studying the first and second stages of the grade separation of Hamil - Kermanshah route with the eastern bypass

10/7/2011

13

Studying the first and second stages of the grade separation bridge of Railway with Noshabad – Kashan route

8/11/2010

14

Studying the first and second stages of five bridges and the grade separations of Daresalaam, Railway, Abu Zayedabad, Aran & Bidgol bypass

8/6/2010

15

Studying the first and second stages of the Oltan Bridge (river) and improving the route

9/12/2009

16

Studying the first and second stages of repairing the Khayavachai Bridge in Meshkinshahr (8 openings with a length of 30 meters)

14/2/2009

17

Studying the first and second stages of three bridges and grade separation of Tabriz - Orumieh freeway

7/5/2008

18

Studying the first and second stages of reinforcing Sarbaz bridge with a length of 220 meters

8/4/2008

19

Studying the first and second stages of immunization of grade separation of Shahid Kasai highway in Tabriz

9/9/2007

Research studies and educational projects on road safety

No.

Title of the Project and its Location

Date of Implementation

1

Road Safety Audit- Tabriz- Urmieh Freeway

6/2019

2

Road Safety Audit- Bandar Abas-Minab and Bandar Abas- Shaid Rajaee Port

3/2019

3

Studying, designing and presenting the proposed immunization plan for Bandar Abbas - Sirjan and Persian Gulf Freeway

21/5/2017

4

Diagnostic study and presenting a plan for improving the safety of high accident points of suburban roads of Kurdistan and Zanjan provinces

16/5/2017

5

Safety plan for the toll checkpoint entrance at Tehran - Saveh Freeway

13/3/2017

6

Preparing typical plans of guardrails and its components

19/4/2016

7

Safety inspection studies on Nowruz 2015

1242 kilometers of most travelled routes of Iran including:

Qom-Salafchegan-Arak-Khorramabad-Ahwaz-Khorramshahr

Borazjan-Bandar Ganavah-Deylam-Hendijan-Bandar Mahshahr

Safety inspection on Haram-ta-Haram Freeway

17/1/2015

8

Safety inspection studies on most travelled routes of Khuzestan Province (1378 Km)

31/8/2014

9

Safety Inspection studies on most travelled routes of West Azarbaijan, with a length of 700 km

20/4/2014

10

Safety inspectioan study on most travelled roads of Mashhad

11/12/2012

11

Safety inspection studies on Dehdez-Izeh-Baqmalek route with a length of 114 km

28/11/2012

12

Instructions on the design of layout of signs and road safety equipment

25/11/2007

13

Providing instructions on the application of safety bumpers and guardrails in road

19/2/2007

Research studies and educational projects on road, road pavement, asphalt and bridge

No.

Title of the Project and its Location

Date of Implementation

1

Providing Current Maintenance cost estimating methods ( optimization PPP contracts)

10/2018

2

Providing Safety Documentation For Safety Improvement of construction and Maintenance Projects 

12/2018

3

Revising Asphalt Cost Estimating Methods

7/2018

4

Preparation instructions for implementation of the Pavement Management System

27/9/2015

5

Preparing instructions for the implementation and maintenance of different types of airport pavement

 27/11/2010

6

Preparing instructions for design, operation and maintenance of cold asphalt

12/1/2010

7

Instructions on designing and implementing materials for pavement layers with appropriate drainage for Iran

30/5/2009

9

Instructions on designing, implementing and maintaining porous asphalt (field research)

5/1/2008

10

Instructions for preventive maintenance of road pavement

25/11/2007

Completed or ongoing projects on supervising road construction

No.

Title of the Project and its Location

Date of Implementation

1

Supervising the implementation of the fencing of the Mahmoud Abad powerhouse

08/2019

2

Supervising the implementation of the Haliveh – Shah Ahmad Project

02/2019

3

Supervising the implementation of the Songhor – Biston Project

10/2018

4

Consulting service for client in ppp (public private partnership) contract (Mashhad – chenaran – ghochan)

10/2018

5

Supervising the implementation of the second exit route of Bushehr (Shif-Gazboland)

21/11/2016

6

Supervising rural roads in the counties of Ahwaz-Hamidieh

19/12/2015

7

Supervising the executive operation of constructing the second highway lane in Gachsaran – Kheirabad route

17/2/2015

8

Supervising executive operation of Ferdows highway with a length of 12 km

21/4/2013

9

Supervising the construction and improvement of by-roads and rural roads in Savojbolagh County

16/5/2017

10

Supervising roads and lanes in Region 16 of Tehran

15/3/2016

11

Supervising construction operation of Sardar Shahid Karimi highway

21/9/2015

12

Supervising the projects for improvement of road pavements in important routes of Iran (fourth factor) in region 3 including Tehran, Qom, Isfahan, Fars, Bushehr and Chaharmahal and Bakhtiari provinces

18/12/2014

13

Supervising roads and lanes in Region 16 of Tehran

22/11/2014

14

Supervising the project for Micro-surfacing asphalt pavement of Salafchegan-Saveh route

3/7/2014

15

Supervising the project for asphalt drainage and improvement of Qom-Salafchegan-Rahjerd highway

2/6/2014

16

Supervising the construction project of "Connecting the bypass route of Aran & Bidgol to Qom-Kashan freeway with a length of 15 km"

19/5/2014

17

Supervising the construction project of "Connecting the bypass route of Aran & Bidgol to Qom-Garmsar route with a length of 20 km"

19/5/2014

18

Supervising the construction and asphalt pavement project of "Kashan-Mashhad Ardehal and Kashan-Darestan routes (Amir Kabir Industrial Town)

19/5/2014

19

Supervising the project of constructing the second lane in Kashan-Abuzeydabad route

15/2/2014

20

Supervising the improvement and asphalt pavement of Qom-Salafchegan Highway

3/6/2013

21

Supervising the improvement and asphalt pavement of Rudehen County roads (Jajroud-Rodehen route)

5/8/2012

22

Supervising the construction of Malekshahi-Meyme route

1/7/2011

23

Supervising the executive operations for improvement and widening of the south bypass of Tabriz

4/1/2004

24

Supervising the 120 meters Khiavachai Bridge in Meshkinshahr

29/9/2010

25

Supervising the construction project of Borazjan-Kenartakhte route

22/5/2010

26

Supervising the project of rural roads in Kashan County

20/8/2008

27

Supervising the project of rural roads in Isfahan County

5/8/2008

28

Supervising the project of rural roads in Nain County

5/8/2008

29

Supervising the construction project of Aran & Bidgol bypass with a length of 47 km

21/5/2008

30

Supervising the executive operation immunization project of Shahid Kasai bypass in Tabriz

6/5/2008

31

Supervising the construction project for the Second lane of Varkan-Kashan  route with a length of 30 Km

24/3/2008